I am a county in Jining, Shandong. The local construction industry is still hot. I am engaged in the construction industry. At 160,000 yuan to invest in building scaffolding steel pipe rental or a 40 -tower crane which profit is better, which one is more stable, in terms of service life and capital recycling?
The service life is that the steel pipe is good, but the 160,000 steel pipes are not good, and the cycle is long, so I think it is still more cost -effective now.
Preliminary investment is better, and the steel pipe income cycle is too long.
16W investment? Too few, there is no benefit. I have considered it before, and later invested in the steel pipe of the wrap, but needed capital, and it took more than 100W to invest in recycling benefits. And the faster you want to earn your own cost, no matter how much you invest, you will basically recover, but the premise you need to have the construction site and money from Party A. There are more tower cranes to make money, because the tower cranes are easy to be old, life span is not long, a tower crane you want to ask the workers and also to repair you, the master must be thousands of masters for a month. Just look at the benefits.